Skip to content
Guangzhou Plant Chain Beauty Technology Co., Ltd. Serving customers across 18 countries · sales@cationicsurfactants.com
Plant Chain company logoPlant ChainCationic Surfactants

All Insights

BTMS-50 Supplier Change Checklist for Conditioner Buyers

Before approving a second source for BTMS-50, ask the supplier to identify the exact blend and attach the certificate of analysis for the lot they intend to send. A purchasing description that says only “BTMS-50” leaves the lab guessing about what it will receive and makes it harder to trace changes after the first commercial delivery.

Specify the grade on the request for quotation

The grade covered by this guide lists Behentrimonium Methosulfate, Cetearyl Alcohol and Butylene Glycol. Its technical data sheet lists 53.0–57.0% quaternary content. Put the full ingredient declaration and the agreed specification on the request for quotation. Ask the supplier to flag differences in the fatty alcohol, carrier, physical form or assay method before sending samples.

Request the current technical data sheet (TDS) and safety data sheet (SDS) by revision. Ask which certificate of analysis (CoA) fields will carry measured results, which will report a pass against a specification, and how each result will be identified by lot.

Agree on what counts as an acceptable replacement

Review item Evidence to record
Material identity Full ingredient declaration, supplier grade code and specification revision.
Lot release Sample lot, matching CoA, test method and receiving checks.
Pilot approval Named conditioner base, approved reference lot and signed observations.
Change control Changes that trigger notice, who receives it and what requires a repeat trial.

Carry the sample decision through to the first delivery

Record the candidate lot on the batch sheet and keep a retained sample of the current grade. Compare the candidate with the approved reference in the same base. Before the trial, agree on which differences in handling, bulk texture and dispensing would matter at your plant. Record the outcome separately from the incoming CoA check so receiving staff can see exactly what the lab approved.

When the first purchase order arrives, reconcile its grade code and lot number with the shipping label, CoA and supplier approval record. If the shipping lot differs from the sample lot, apply the incoming acceptance checks you agreed with quality. Keep the approved specification and any exceptions with the purchasing record for future reorders.

Request technical documents for a grade comparison. Include the current grade, conditioner format and planned trial scale.

Specification reference: BTMS50 technical data sheet, composition and physical properties.